АО «Апатит» (Череповецкий химический кластер Группы «ФосАгро»)

Apatit JSC (PhosAgro Group)

Mineral fertilizers manufacturing plants, Cherepovets

PHOSAGRO‑Cherepovets PJSC

nitrogen and phosphorous complexes
2004 – 2009
Reconstruction and new construction, automation

Chemical industry

FIGURES and FACTS
  • 1 000+
    Total power of consuming units,
    MW
  • 300+
    Installed equipment,
    pcs
  • 50+
    Cable networks,
    km
Summary

Improvement of outdoor electric power supply system of PhosAgro‑Cherepovets OJSC (nitrogen complex) due to the commissioning of gas turbine electric power plant (GTEPP) 32 MW.

Facility

Mineral fertilizers manufacturing plants, Cherepovets.

Completed works
  • Replacement of 2 220/10/6 kV power transformers.
  • Improvement of power transformers protection system.
  • Improvement of Relay Protection and Emergency Automation of 220 kV electric power supply lines NITROGEN‑1, NITROGEN‑2, NITROGEN‑3.
  • Arrangement of fiber‑optic communication between PS‑500 — stand‑by substation SSS2 — MSS‑5 — MSS‑5А.
  • Construction of water circulation system of AMMONIA‑2 workshop.
  • Improvement of Relay Protection and Emergency Automation of 220 kV electric power supply lines Phosphate‑1, Phosphate‑2, Phosphate‑3 and Phosphate‑4.
  • Complete reconstruction of water‑protective structures in order to increase waste treatment efficiency.
  • Design, installation and precommissioning of CPCS Computerized Process Control system of water‑protective structures upper and lower levels.
  • Improvement of BOPS (balance‑of‑plant switchgear) of the TPP.
  • Complete improvement of electrical equipment of mineral fertilizers production workshop.
  • Changing the earthing mode of transformers neutral point and reconstruction of capacitance current compensation devices in 6‑10 kV network (phosphorous complex).

Feedback from the Client, PhosAgro‑Cherepovets JSC