OLKON JSC, Olenegorsk Mining and Processing Plant, Olenegorsk

OLKON JSC

Olenegorsk Mining and Processing Plant, Olenegorsk

Integrated electric power supply system of Olenegorsk Mining and Processing Plant

2004 – 2010
Electric power supply

mining and concentrating industry

FIGURES and FACTS
  • 1 000+
    Total power of consuming units,
    MW
  • 110
    Voltage rating,
    kV
  • 80+
    Cable networks,
    km
Facility

Olenegorsk Mining and Processing Plant, Olenegorsk.

Completed works

Construction of 110/10 kV PS substation No. 37:

  • Reconstruction.
  • Development of Detailed Design Documentation.
  • Electrical part, Relay Protection and Automation, architectural and civil part.
  • Coordination with all the interested companies.

Main venting and air heating unit (MVAHU) of the underground mine:

  • Development of Detailed Design Documentation.
  • Electric power supply, power electrical equipment, automation and remote control, electric lighting.

Underground mine. Underground central distribution substation (UCDS) and outdoor electric power supply:

  • Development of Detailed Design Documentation.
  • Electrical part.

High‑voltage line VL‑110 kV and 110/6 kV OSG on recycled water pump station of the crushing‑and‑concentrating plant of Kharius lake:

  • Development of Detailed Design Documentation.
  • Electrical part.

Substation‑202, 110 kV OSG:

  • Reconstruction of the operating substation.
  • Installation of digital protection.
map