Kola Nuclear Power Plant
2014 – 2016
Construction and installation works
FIGURES and FACTS
-
100+Installed equipment,
pcs -
60+Cable networks,
km
Summary
Construction and installation works within the frames of preparation of the plant for OSART‑IAEA mission.
Facility
Kola Nuclear Power Plant, Polyarnye Zori City.
Set of works
Integrated power supply.
Completed works
Construction and installation works with regard to:
- Improvement of reliability of the general power transformer GPT‑3, automated radiation situation monitoring system (ARSMS) and retransmission station building.
- Fire‑fighting machinery home station.
Improvement of:
- Cable routes with regard to fire safety improvement of blocks 1‑4.
- Outdoor lighting of the industrial site of Kola Nuclear Power Plant. Gatehouse II.
- Main transformers Т‑1 - 8 and BOP stand‑by transformers 1ТР, 2ТР with regard to installation of monitoring system of transformer insulation technical condition under the operating voltage.
Repair works:
- Repair of OSG power and high voltage equipment of Kola NPP.
- Repair of electrical devices and instrumentation lines of Kola NPP.
- Repair of control rooms of main control rooms MCR‑3,4, emergency control room ECR‑3,4, all‑station systems control room, radiation monitoring control room of Kola NPP. Installation of protective elements.
Feedback from the Client, Concern Rosenergoatom JSC (in russian).