ОK «РУСАЛ», строительство Тайшетского алюминиевого завода, Иркутская область, г. Тайшет

Taishet Aluminum Plant

Russian Engineering Company LLC, branch of United Company RUSAL, Irkutsk Region, Taishet

Construction of Taishet Aluminum Plant

2005 – 2009
Integrated power supply for production and infrastructure (design)

Non‑ferrous metal industry (aluminum industry)

FIGURES and FACTS
  • 1 000+
    Total power of consuming units,
    MW
  • 180+
    Installed equipment,
    pcs
  • 40+
    Cable networks,
    km
Facility

Taishet Aluminum Plant, Irkutsk Region, Taishet.

Completed works
  • 220 kV closed distribution unit (220 kV CDU) to power rectifier‑transformer substation and 220/10 kV MSS.
    Equipment of 220 kV CDU is a packaged distribution device with SF6 gas insulation (IGIS).
  • 2 rectifier‑transformer substations (RTS‑1 and RTS‑2) for (DC) supply of pot line units.
    RTS are equipped with converting units (6 load center units for each RTS delivered by ALSTOM Company.
  • Rectifier‑transformer substations (RTS‑1 and RTS‑2) are powered by 220 kV CDU via 6 cable lines (for each RTS), received from three singe‑core cables with XLPE insulation laid along the cable structures on the rack.
  • Main step‑down substation 220/10.5 kV MSS to power plant power consumers, connected to 10 kV bus lines as part of four transformers with a capacity of 100 MW each. 220/10.5 kV MSS is connected to 220 kV CDU via cable lines.
  • Main distribution point DP‑1, powered from 220/10.5 kV MSS to ensure uninterrupted power supply of plant consumers represents an 8‑sectional 10 kV distribution device (DD‑10 kV), consisting of 60 plant‑produced packaged chambers.